The project
Under ABJ CM Buaran Package 45, Spektrum carried out a series of electrical works at the Buaran water treatment plant, from VSD panel upgrades to lighting and decanter rehabilitation. This story covers two of them: the replacement of the central control panel system (45-45122) and of the auxiliary system for waste basins B1 and B2 (45-45121).
Both packages followed the same path: delivery and placement of the new panels, installation and wiring, test commissioning with the client, and operator training before handover.
How the work was done
Tap a photo to view it full size.
1New panel delivery
The new control panels arrived at the plant.
2Placement
Panels were relocated and set in their final positions.
3MCC panel installation
The motor control centre (MCC) panels were installed.
4Panel wiring
Power and control wiring was completed and checked.
5Test commissioning
The new systems were tested and commissioned with the client.
6Operator training
Plant operators were trained on the new central control panel.
Planning a similar project?
Tell us about your site and scope, and our engineers will get back to you within one business day.