Overview

The project

Under ABJ CM Buaran Package 45, Spektrum carried out a series of electrical works at the Buaran water treatment plant, from VSD panel upgrades to lighting and decanter rehabilitation. This story covers two of them: the replacement of the central control panel system (45-45122) and of the auxiliary system for waste basins B1 and B2 (45-45121).

Both packages followed the same path: delivery and placement of the new panels, installation and wiring, test commissioning with the client, and operator training before handover.

Step by step

How the work was done

Tap a photo to view it full size.

  1. New panel delivery
    1

    New panel delivery

    The new control panels arrived at the plant.

  2. Placement
    2

    Placement

    Panels were relocated and set in their final positions.

  3. MCC panel installation
    3

    MCC panel installation

    The motor control centre (MCC) panels were installed.

  4. Panel wiring
    4

    Panel wiring

    Power and control wiring was completed and checked.

  5. Test commissioning
    5

    Test commissioning

    The new systems were tested and commissioned with the client.

  6. Operator training
    6

    Operator training

    Plant operators were trained on the new central control panel.

More photos

Control Panels, Buaran Water Treatment Plant Control Panels, Buaran Water Treatment Plant Control Panels, Buaran Water Treatment Plant Control Panels, Buaran Water Treatment Plant Control Panels, Buaran Water Treatment Plant Control Panels, Buaran Water Treatment Plant

Planning a similar project?

Tell us about your site and scope, and our engineers will get back to you within one business day.