Skip to main content
ClientPerum Jasa Tirta II
LocationTarum Timur Electric Pump Station (PETT), Karawang, West Java
Year2026
DisciplineMechanical – gearbox
Overview

The project

Perum Jasa Tirta II operates the Tarum Timur electric pumps (PETT) in Karawang, West Java. Spektrum replaced the gearbox of pump No.3, handling the lifting and installation of the new unit and the checks needed to bring the pump back into service.

It follows our earlier work at the same station: the rehabilitation of PETT No.1, including a pump gearbox replacement, in 2023.

Step by step

How the work was done

Tap a photo to view it full size.

  1. Unpacking
    1

    Unpacking

    The new gearbox was lifted out of its shipping crate.

  2. Installation
    2

    Installation

    The gearbox was lowered into place and aligned with the pump drive train.

  3. Lube oil pressure check
    3

    Lube oil pressure check

    Lubrication pressure was verified before start-up.

  4. Start-up from the control panel
    4

    Start-up from the control panel

    The pump was started and monitored from its control panel.

  5. Vibration monitoring
    5

    Vibration monitoring

    Vibration readings were taken after start-up to confirm smooth running.

More photos

Gearbox Replacement, Tarum Timur Pump No.3

Planning a similar project?

Tell us about your site and scope, and our engineers will get back to you within one business day.